Work on the Bayonne Bridge Shared-Use Path is Complete
Posted October 08, 2025The Port Authority has advised the City of Bayonne that rehabilitation work is complete on the Shared-Use Path on the Bayonne Bridge. That path is back to 24/7 operations. There are no more overnight closures.
The "before" photo shows the Shared-Use Path (SUP) with surface alligator cracking, while the "after" photo shows a newly resurfaced path with fresh markings across the span.
